Emergency And Surge Event (E.A.S.E.) Management

Our client needed to have an annual surge of frozen products delivered within a 14-day period to points across the U.S. All shipments were planned to move out of a remote facility that generally averaged two to three shipments per day; this planned surge was an estimated 750 percent increase in volume per day.